03 — Concept zoning

50 m² indoor facility

Concept only — the block plan assumes a rectangular room and must be redrawn after the exact internal dimensions, doors, windows and ceiling height are measured.

Illustrative floor plan — not to scale

35 m² member bay hall

M01

Group A

M02

Group B

M03

Group C

M04

Group D

M05

Group E

M06

Group A

M07

Group B

M08

Group C

M09

Group D

M10

Group E

M11

Group A

M12

Group B

M13

Group C

M14

Group D

M15

Group E

M16

Group A

M17

Group B

M18

Group C

M19

Group D

M20

Group E

M21

Group A

M22

Group B

M23

Group C

M24

Group D

M25

Group E

Member bay hall35 m²
Fire + monitoring3 m²
Locked drying3 m²
Water + electrical5 m²
Airlock + hygiene4 m²

Essential build systems

  • Washable sealed envelope and chemical-resistant floor
  • Dedicated electrical DB, bay circuits and surge protection
  • Engineer-sized cooling, humidity removal and circulation
  • Water tank, filtration, pump, member valves and drainage
  • Environmental sensors, data logging and leak detection

Access + safety

  • Member-specific credentials and individually locked bays
  • CCTV at entrances and shared aisles, not private use areas
  • Fire detection, extinguishers and emergency lighting
  • No children, public access, pooled storage or staff tending
  • Empty-room commissioning before any plants enter
Do not purchase lighting before the connected-load and heat-load studies are complete. The electrical, climate and fire systems must be engineered as one package.